Nature-based Solutions: Leominster, MA

The City of Leominster is one of five municipalities participating in the Municipal Vulnerability Preparedness (MVP) grant under which NRWA is partnering to create a plan for nature-based solutions to be implemented in the each of the five communities to address negative impacts of climate change. The NRWA has long been active in Leominster through our water monitoring program and through environmental education programs in Leominster schools, including Scientist-in-Residence and River Classroom. This project to address the impacts of climate change is an opportunity for individuals, communities, businesses, and non-profits to again come together to improve community resilience in the face of climate change, and protect a healthy environment for humans and wildlife.

Leominster Site Visits

Leominster community members had the opportunity to work with project leaders during two Community Meetings (details below) to help identify priority sites in the City of Leominster that could be improved through nature-based solutions to address negative climate impacts. Following the two Community Meetings, the BSC Group closely examined the site list for Leominster, removing some sites from the list for a variety of reasons ranging from lack of permission from owner of a private parcel to low likelihood that nature-based solutions would have a significant impact at that particular site. 

Once the final site visit list was resolved, in March 2024, project leaders, consultants, town officials, and community members visited each of the selected sites for an on the ground view of the location. The group reviewed the landscape that might be contributing to the climate issues at the site, and discussed what nature-based solutions could be implemented at the site to make it more climate resilient. 

Project site list:

  1. Mechanic Street
  2. Fournier Ballfields 
  3. Barrett Park 
  4. Johnny Appleseed State Park
  5. Mall at Whitney Field Area 

BSC Data Viewer

NRWA consultant, BSC Group, has created an online GIS tool for the public to use to view the Leominster sites. The viewer provides an aerial view of each site and allows the user to add layers to show wetlands, rare/endangered species habitat, flood plain, and more.  

Use BSC Data Viewer.  Short NRWA tutorial on use of BSC Data Viewer.

 

RDG's Soil Maps and Research

Regenerative Design Group (RDG), acting as a consultant on this project, conducted an assessment of soils in Leominster, and prepared preliminary recommendations for ways to improve soil health in the City. In their resultant Healthy Soils Report: Fitchburg-NRWA Watershed-Wide Nature-based Solutions Project, RDG states "Living soils are the foundation for the ecosystems that shape the character of our communities, enhance the function of our watersheds, support the livelihoods of farmers and foresters, and underpin the rich diversity of life across the terrestrial environment."

Soils can have a strong impact on the success of nature-based climate solutions, making soil health a key consideration for Leominster as the City assesses a path toward greater climate resiliency. The good news is that human action can improve soil health in areas where it is degraded, as well protect healthy soils from degradation.

View RDG's full Healthy Soils Report: Fitchburg-NRWA Watershed-Wide Nature-based Solutions Project, which provides an introduction to the importance of soil health, the assessment of soils in Leominster and the other four project communities, soil improvement recommendations, with supporting graphics and maps that include project site locations. 

BACKGROUND

Project Kickoff Meeting

As described on the project overview page, the project was kicked off with the meeting of city officials and leaders, together with NRWA project staff. NRWA staff shared a pre-prepared video from consultant, BSC Group, and gave their own presentation about the project. NRWA staff then facilitated a conversation about the goals of the project and steps that would be taken to ensure community involvement. At the kickoff meeting, City officials identified key areas of concern for negative climate impacts on the city. Not surprisingly after the intense storm on September 11, 2023 and resultant extensive flood damage, the group had a strong concern about floods, increase in severity of storms (rain, snow, ice), polluted runoff from increasingly heavy rain event, and the desire for more green space in the city to be accessible to all. View notes from Kick-off Meeting (PDF, pages 1-3).

First Community Meeting

The kickoff meeting was followed by a first Community Meeting which was held in-person at the Leominster Town Hall Auditorium on February 5, 2024. Extensive outreach was done through newspaper, email blasts, flyers, e-invitations, phone calls, Facebook, and in-person meetings to encourage diverse community representation at the Community Meeting. Informational flyers were presented in EnglishSpanish, and Haitian Creole.

At this first meeting individuals heard a presentation about this project, its goals, information about nature-based solutions, and what feedback project leaders were looking for from the group.  Attendees then broke into small groups and using maps as tools, discussed priority concerns about what negative impacts of climate they would like to see addressed in the City. They further identified specific locations where nature-based solutions could improve a current problematic situation, At the end of the meeting, these ideas were shared with the full group and detailed notes were gathered by project leaders.  View notes from the first Community Meeting in Leominster (PDF, pages 4-7). View more photos from the first Community Meeting.

 

Second Community Meeting

Following the first Community Meeting, project leaders compiled the information gathered from attendees, as well as from surveys that were completed, to create a list of potential sites in Leominster to be considered for nature-based solution projects. A second Community meeting was held by Zoom on February 12, 2024. Attendees from the first meeting were strongly encouraged to attend to hear a presentation by BSC Group about the information gathered at the first meeting. Sites identified at the first meeting were each discussed to determine if the group felt that the site was a strong match for a nature-based solution, and a priority list was created to be further investigated by a on-site visit by the project team and community members. View video of the second Leominster Community Meeting. (1:51:26 min.)  View notes from the second Leominster Community Meeting (PDF, pages 8-17)..

 

Watch for additional updates on this page as this project continues!